New Penthouse in Balzan

Balzan
€700,000
3   beds   3   bath shower
Kitchen

Artistic rendering of the kitchen. 

Bathroom

Artistic rendering of the shared bathroom.

Pool

Artistic rendering of the roof top pool.

Front terrace

Artistic rendering of the front terrace.

Floorplan

There are multiple apartments for sale in this new apartment block in Balzan.

This penhouse has three bedrooms, two with en-suites and one with a large walk-in closet.Two bedrooms additionally have access to private balconies.

Floorplan

The private roof has a small pool.

Description

This new penthouse in Balzan provides spacious comfort for inside/outside living. A huge open-plan living/dining area provides space for stretching out and entertaining. Two of the bedrooms have en-suite bathrooms. The apartment also has a laundry room and box room. The highlight of this penthouse is a cosy swimming pool on the roof where you can enjoy a starry summer night with friends. 

This development will be completed in late Summer 2020.

ABOUT BALZAN

Balzan is one of the so-called Three Villages, along with neighbouring Lija and Attard, that lie at the heart of Malta. Many wealthy families built summer residences here in the early years of the 20th century, and the Three Villages are still considered an exclusive urban area. A stroll through Balzan's old village core reveals its other architectural gems - from grand villas to old chapels. Lots of character and historical buildings can be found in the older narrow and winding streets of Balzan. The San Anton and Villa Bologna gardens are close by in Attard and are certainly worth a visit.


Features
Ref: MT-100143
Property Type: Penthouse
Bedrooms: 3
Bathrooms: 3
Age: 0 - 10 years
Floor: 4
Condition at Sale: Finished / Converted
Ground Rent: Freehold
Rooms in Property: Bedrooms | Bathrooms | Kitchen | Dining Room | Box Room | Washroom | Living Room
Pool: Private Pool
View: Town View
Roof: Private Roof
Accessibility: Lift
Kitchen: Open Plan
Outside Space: Terrace | Balcony
En-Suites: 2
Proposed Completion Date: Summer 2020